Celebrating 50 Years of Master Cabinetmaking • 1976 – 2026

Painted cabinetry

The Burnham Market Townhouse

Green painted doors with brass handles, a pale stone-effect worktop and an undermount sink. The doors in the photographs have handles, so this is not described as a handleless kitchen.

The photographs show green painted cabinetry with brass handles, a pale worktop and an undermount sink. Handles are clearly visible, so the earlier line about handleless flat-panel doors is withdrawn.

The worktop looks like stone. The old caption named it as quartz. The picture alone does not prove the material, so this page says only that the surface is pale. The project is published under the name The Burnham Market Townhouse.

Burnham Market is one of the places the workshop already lists as regular work, alongside Holt and Wells-next-the-Sea. These photographs are the cabinetry we are willing to describe. They are not a story about the rest of the house.

Green painted kitchen cabinets with brass handles and a pale worktop.
Green painted kitchen cabinets with brass handles and a pale worktop.
A wider view of the green painted cabinetry.
A wider view of the green painted cabinetry.
An undermount sink set into a pale worktop, with brass handles on the doors.
An undermount sink set into a pale worktop, with brass handles on the doors.
Close view of green painted doors and brass handles.
Close view of green painted doors and brass handles.

Read the place page for Burnham Market. Other area pages may mention these photographs. They say when the pictures are not of a house in that place.

How a kitchen is made

The times below are the ones already set out in the timeline guide. They are not a promise that every house will match the shorter end.

  1. 1

    Consultation and design

    2–4 weeks. A complimentary design consultation, then drawings revised until the kitchen fits the way the house is used.

  2. 2

    Scheduling and final survey

    1–2 weeks. Once the design is agreed, the house is measured in millimetres and the job is booked into the Thuxton workshop.

  3. 3

    Making the kitchen

    8–12 weeks in the workshop, after the survey. The cabinets are made by hand at R.E. Woods & Son.

  4. 4

    Fitting, and painting if chosen

    2–3 weeks. The kitchen is fitted to the room. Hand-painted finishes are painted in place.

Read the planning and timeline guide for the full sequence, and the cost guide for why there is no package price. There is no price on this page.

Monday to Friday, 8am to 5pm. The workshop is at Mountain Ash, Dereham Road, Thuxton, NR9 4QH. Fitted furniture and joinery that is not a kitchen is on rewoods-cabinetmakers.com.

Back to the portfolio