North Norfolk
Bespoke kitchens in North Norfolk
Handmade at our family workshop in Thuxton for houses in North Norfolk. R.E. Woods & Son designs the kitchen to the room, then builds it. The workshop stage takes 8–12 weeks.

North Norfolk on this site means the coast and the towns just inland: Holt, Blakeney, Cley, Wells-next-the-Sea, Burnham Market, Sheringham, Cromer and Fakenham. The workshop is in Thuxton, south of that coast. The FAQ already says we frequently work in Burnham Market, Holt and Wells, and in Norwich, Wymondham and Dereham besides.
The houses share a practical problem more than a single style. Flint cottages with low ceilings, harbour houses that need somewhere for wet coats, and older town houses with chimneys all punish a standard cabinet size. A bespoke kitchen is measured to those constraints. The making is the same wherever the house is: drawn, surveyed, then built in Thuxton over 8–12 weeks.
Three published projects sit in this part of the county. Read them for what the photographs show. The Holt set is an oak kitchen with a beamed ceiling and an island, plus a burr-oak dresser with an Aga. It is not labelled here as a vaulted barn. Use the town pages for the local notes, and the portfolio for the pictures. Do not treat this regional page as a claim that every village has a case study.
Photographs we can point to
The Blakeney FarmhouseDeep blue in-frame shaker doors, brass cup handles, an island, a pantry with oak shelves, and oak drawer boxes with dovetail joints. The sink in the photographs is a single undermount bowl, not a double Belfast.
The Burnham Market TownhouseGreen painted doors with brass handles, a pale stone-effect worktop and an undermount sink. The doors in the photographs have handles, so this is not described as a handleless kitchen.
Holt: oak kitchen and dresserThe lead photograph shows an oak kitchen with a high beamed ceiling, a central island and an Aga. The other three photographs show a burr-oak dresser with an Aga, not an island or a breakfast station.
How a kitchen is made
The times below are the ones already set out in the timeline guide. They are not a promise that every house will match the shorter end.
- 1
Consultation and design
2–4 weeks. A complimentary design consultation, then drawings revised until the kitchen fits the way the house is used.
- 2
Scheduling and final survey
1–2 weeks. Once the design is agreed, the house is measured in millimetres and the job is booked into the Thuxton workshop.
- 3
Making the kitchen
8–12 weeks in the workshop, after the survey. The cabinets are made by hand at R.E. Woods & Son.
- 4
Fitting, and painting if chosen
2–3 weeks. The kitchen is fitted to the room. Hand-painted finishes are painted in place.
Read the planning and timeline guide for the full sequence, and the cost guide for why there is no package price. There is no price on this page.
Monday to Friday, 8am to 5pm. The workshop is at Mountain Ash, Dereham Road, Thuxton, NR9 4QH. Fitted furniture and joinery that is not a kitchen is on rewoods-cabinetmakers.com.