Celebrating 50 Years of Master Cabinetmaking • 1976 – 2026

Beaded shaker

The Wymondham Classic

Beaded shaker doors in a warm neutral paint, nickel knobs and cup handles, an island, a farmhouse sink and a built-in wine cooler.

The photographs show beaded shaker doors painted a warm neutral colour, with nickel knobs and cup handles. There is an island, a farmhouse sink and a built-in wine cooler. The worktops are pale. The pictures support the earlier description more closely than the other projects on this site.

The project is published as The Wymondham Classic. No price, client name or completion date is stated, because the site does not give them.

Wymondham is named among the places the workshop frequently works. The kitchen in these pictures is one commission, not a house style for the whole town.

Beaded shaker doors in a warm neutral paint, with an island.
Beaded shaker doors in a warm neutral paint, with an island.
A built-in wine cooler between beaded shaker doors.
A built-in wine cooler between beaded shaker doors.
Nickel knobs and cup handles on beaded shaker doors.
Nickel knobs and cup handles on beaded shaker doors.
Another view of the neutral shaker kitchen, including a farmhouse sink.
Another view of the neutral shaker kitchen, including a farmhouse sink.

Read the place page for Wymondham. Other area pages may mention these photographs. They say when the pictures are not of a house in that place.

How a kitchen is made

The times below are the ones already set out in the timeline guide. They are not a promise that every house will match the shorter end.

  1. 1

    Consultation and design

    2–4 weeks. A complimentary design consultation, then drawings revised until the kitchen fits the way the house is used.

  2. 2

    Scheduling and final survey

    1–2 weeks. Once the design is agreed, the house is measured in millimetres and the job is booked into the Thuxton workshop.

  3. 3

    Making the kitchen

    8–12 weeks in the workshop, after the survey. The cabinets are made by hand at R.E. Woods & Son.

  4. 4

    Fitting, and painting if chosen

    2–3 weeks. The kitchen is fitted to the room. Hand-painted finishes are painted in place.

Read the planning and timeline guide for the full sequence, and the cost guide for why there is no package price. There is no price on this page.

Monday to Friday, 8am to 5pm. The workshop is at Mountain Ash, Dereham Road, Thuxton, NR9 4QH. Fitted furniture and joinery that is not a kitchen is on rewoods-cabinetmakers.com.

Back to the portfolio